MGC Solutions was engaged by Coleman Rail to deliver these critical works as part of the ongoing Metronet program. Works delivered to the local inhouse team were:
- Long lead material assessment and procurement
- Off site manufacture of signalling frames and locations
- Factory acceptance testing
- Points machine installation
- Field testing and commissioning
- Civil installation and structural installation of wayside signalling infrastructure
- Cable installation, termination and testing
- Signalling, set to work, test and commission
- Signalling entry into service
- Optic fibre cable installation
- Optic fibre splicing testing and cutover of critical services